Filters
Showing: 904 results
PAGE
Interim Report January-June 2019
2019 Arjo's interim report for January-June 2019 will be published on July 18, 2019. We invite fund managers, analysts and the media to participate in the conference call. Please see details below to join the conference. Swedish dial-in number:
BLOG
The time factor in Alternating Pressure
for longer times. In independent third party tests, AtmosAir Velaris demonstrated full pressure offloading at the sacral and heel areas for significantly longer times than the other tested surfaces. Find out more on arjo.com/velaris. Why “Lower
PRODUCT
Minstrel
Minstrel is the classic loop sling lifter for everyday transfer routines with dependent residents.