Showing: 843 results
Citadel Plus ENT-ACC101 Trapeze mount assembly Instructions for use
ConformX Instructions for use 2 Way Turn Mattress Overlay
ConformX Instructions for use - 2 Way Turn Mattress Replacement
Enterprise ENT-ACC02, ACC02-SH, ACC04 Instructions for use
Simulflex Instructions for use 2-way Turn mattress overlay
Enterprise ENT-ACC67 Side rail extensions Instructions for use
KWIKtrak 2-Post Semi-Permanent Rack Instructions for Use
AtmosAir 9000A Instructions for use Mattress Replacement System
Arjo Prioma Electric Couch Range Instructions for use
Prone Positioning and Nimbus Professional
Prone positioning to prevent pressure injuries | Arjo Prone positioning. For the most vulnerable patients. Turning and managing very sick patients face down for significant improvements. Find out more at Arjo.
Investors
About Arjo - For investors, shareholders and analysts Investors Arjo investor relations. Market-leading supplier of medical devices and solutions for patients with reduced mobility and age-related diseases. Visit us today!
Sit to stand study shows Sara Flex 'allows more forward knee movement
An evaluation of 6 different sit to stand devices for use in rehabilitation shows an 'overwhelming preference' for the Sara® Flex knee support during a study in Loughborough University, UK.
Disposable loop limb sling
caregiver with lifting, supporting and positioning the limb for easier access when performing activities such as dressing, foot care, wound care and leg dressing. It is designed for single patient use.
Alpha Active 3
Designed for the prevention and management of pressure injuries,¹ the Alpha Active® 3 pressure redistributing mattress overlay system is suitable for a range of care environments, including home and community care settings.
Interim report January-March 2019
Interim report January-March 2019 The interim report for January-March 2019 will be published on May 7, 2019.
Interim Report January-September 2019
Interim Report January-September 2019 Arjo's interim report for January-September 2019 will be published on October 22, 2019.
Interim report January-March 2018
Interim report January-March 2018 The interim report for January-March 2018 will be published on May 4, 2018.
Interim Report January-June 2020
Interim Report January-June 2020 Arjo's interim report for January-June 2020 will be published on July 17, 2020.