Showing: 274 results
In bed
mobilisation in bed | Arjo Mobilisation in bed. Methods to support patient rehabilitation and recovery through regular repositioning, progressive verticalisation and upright positioning. Advanced support surfaces and versatile bed frame articulation ... articulation can help support in-bed mobilization.
Bariatric medical bed
Bariatric bed solutions | Arjo Bariatric bed solutions. For patients weighing up to 454 kg (1000 lbs). Compatible with a range of therapeutic support surfaces for critically ill patients.
Out of bed transfer
Out of Bed Transfer - Early Mobility | Arjo Out of bed transfer. Solutions for lateral and seated transfers out of bed. Patient handling equipment for high-quality care. Find out more at Arjo. Transfer can be achieved using a patient lift system
Sitting on edge of bed
of bed. Solutions to facilitate care and rehabilitation. Sitting facilitate good eye contact and personal interaction. For high-quality care. The Sara Combilizer enables patients to be placed into a variety of seated positions out of bed.
5 Early Mobility Solutions to Optimize Veteran Recovery from In-Bed to Out-of-Bed Mobilization
The significance of early mobility in the rehabilitation of war veterans cannot be overstated. In fact, muscle wasting occurs early and rapidly during the first week of critical illness, with losses of up to 20% seen for those in multi organ failure.